Job Management                                Job Planner                               Job Planner Functionality

Installer Availability Control Scheduling

As stated on the previous page, there are four ways to schedule appointments using the Installer Availability area of the Job Planner:

·Drag Request Node from the Requests Tree to the Appointment Block (or Installer Tile if “Schedule By Drop Date” is not checked)

·Select the desired Installer Tile, then double-click the Requested Task Block in the Gantt Chart.

·Select the desired Installer Tile, then double-click the Requested Node in the Requests Tree.

Note: The Job Planner does not stop the User from scheduling multiple appointments in the same Appointment Block of an Installer Tile.

 

 

 

 

 

 

 

Previous Page                              Page  9   of   9