Job Management  Job Costing  Material Costs

Material Costs (continued)

Materials Returned to a Warehouse

If parts are returned to a Warehouse from a Job, the cost of the returned parts is deducted from the Job Material costs.  Parts may be returned to a Warehouse using one of two methods; using the Issue Parts function within a Job record or using the Issue/Returns function from the Inventory module.  Both methods have the same end result.  The return method used is based on User preference; whichever method is found easiest to use.

Refer to the screens shots on the following page for examples of each part return method.

ss10022

 

 

Page   1  2  3  4  5  6  7  8  9  10  11  12  13                                         Page  11